— 08 · PLASTERING
Walls rarely come through a renovation untouched. Old tiles come off, fittings move and dents and cracks show up. I patch, replace and prepare plasterboard walls in homes across Bentleigh and surrounding Melbourne suburbs, so the next layer, whether that’s tile or paint, has a sound surface to go on.
≈15 years renovation experience · Free on-site assessment · Detailed written quotation
— WHAT THE WORK COVERS
Most plastering in a home renovation falls into one of these. Often a single room needs a bit of all three.
01 Patching and repairs
Holes from old fixtures, dents, cracked joints and damaged corners. Suits you if the wall itself is sound and only the surface needs attention.
—
02 Plasterboard replacement and installation
Cutting out and replacing damaged sections, or fitting new sheets where a wall has been opened up during a renovation. Suits you if patching would only hide a weak or damaged board.
—
03 Preparing walls for tile or paint
Setting joints, filling, sanding and checking the surface is flat and ready for the finish. Suits you if new tiles or a fresh coat of paint are the next step. More on this on my surface preparation page.
— LAYER 3 · PREPARATION
In my experience, proper preparation matters as much as the visible finish. A more expensive tile or paint can’t compensate for an unsuitable or poorly prepared surface. A ridge left on a joint throws a shadow under a light. A soft patch behind a tile can let it work loose. That’s why I treat plastering as part of the job, not something to rush before the finish goes on.
— WHERE THE TRADES MEET
In a bathroom, kitchen or laundry update, the walls usually move through the same order: old finishes come off, damaged board is repaired or replaced, the surface is prepared, then tiles go on the wet areas and paint goes on the rest.
Because I handle wall and floor tiling and interior and exterior painting as well, you work directly with me across those stages. The edge where the tiles stop and the paint starts gets planned from the beginning rather than sorted out at the end.
Where pipes or wiring need to move, appropriately licensed specialists complete that work before the walls are closed up and finished.
— LAYER 5 · EXISTING CONDITIONS
Concealed conditions may only become apparent after existing finishes are removed. A wall that looks like it needs a small patch can turn out to have moisture damage or a larger section of weak board behind old tiles. If that happens, I show you what I’ve found and explain the options before going further.
Plastering costs, timeframes and work requirements depend on your existing walls, the materials selected and the agreed scope. Any figures I give before a detailed written quotation are general guidance only. My plastering work is limited to wall linings and finishing. I don’t carry out structural, engineering or design work.
— BEFORE YOU GET IN TOUCH
— Which rooms and walls need attention, and roughly how large the area is
— Whether the damage is on the surface or the board feels soft or loose
— Whether tiling or painting is planned for the same room
— A few clear photos, if you have them
The on-site assessment is free, and I’ll talk you through what I find before preparing a written quotation. When you’re ready, discuss your project with me, or read what happens when old tiles come off first.